Project | Client | Project Details | Country | Status |
---|---|---|---|---|
132kV VAN STEEL FACTORY ELEKTRİK | BEST ELEKTRİK TAAH. VE TİC. A.Ş (BETAŞ) | Secondary Project; Electrical Panel Manufacturing | Turkey | Completed |
İTM.319 154/33kV BERGAMA OSB TM | ENERBA ENERJİ SAN. VE TİC. A.Ş. | Secondary Project; Electrical Panel Manufacturing; Test & Commissioning; Secondary Mounting | Turkey | Completed |
İTM.326 154/33kV UZAY OSB TM | ERİŞİM MÜHENDİSLİK | Secondary Project; Electrical Panel Manufacturing; Test & Commissioning; SCADA & Automation; Secondary Mounting | Turkey | Completed |
154kV VELİEFENDİ GIS TM | SIEMENS | Secondary Project; Electrical Panel Manufacturing; PTP & RTU Tests; Test & Commissioning | Turkey | Completed |
CHORDULA HEPP | ANDRITZ HYDRO | Panel Production | Turkey | Ongoing |
HUDAYYAR TM | AZE ENERGY | Secondary Project; Panel Production | Uzbekistan | Ongoing |
154 - 33 kV KARAKEÇİLİ TM | TERMİK ENERGY | Secondary Project; Panel Production; Test & Commissioning | Turkey | Ongoing |
154 - 6.3 kV BURSA CEMENT | RAVEN ENERGY | Secondary Project; Electrical Panel Manufacturing; Test & Commissioning; SCADA & Automation | Turkey | Ongoing |
154 - 33 kV EUROPE FREE ZONE | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; SCADA & Automation; Secondary Assembly | Turkey | Completed |
İTM.18-14 154 33 kV ANAMUR TM | MEHMET LATİF ALTUN | Secondary Project; Panel Production; Test & Commissioning; SCADA & Automation | Turkey | Completed |
154 kv KARAİSALI TM | MEHMET LATİF ALTUN | Panel Production | Turkey | Completed |
154/33 kV KAHRAMANMARAŞ OSB | MEHMET LATİF ALTUN | Secondary Project; Panel Production; Test&Commissioning; SCADA&Automation | Turkey | Completed |
HUDAYYAR TM | AZE ENERGY | Secondary Project; Panel Production; Test&Commissioning | Uzbekistan | Completed |
154/33 kV BOSTANCI GIS TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test&Commissioning; SCADA&Automation | Turkey | Completed |
154/33 kV PİYALE GIS TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test&Commissioning; SCADA&Automation | Turkey | Completed |
154/33 kV ERMENEK 380 TM | MET ENERGY PRODUCTION | Secondary Project; Panel Production; Test&Commissioning; SCADA&Automation | Turkey | Completed |
ESBAŞ GIS TM | PUNTAYELİ ENGINEERING | Secondary Project; Panel Production; Test&Commissioning; SCADA&Automation | Turkey | Completed |
154/33 kV BİRECİK TM | MEHMET LATİF ALTUN | Secondary Project | Turkey | Completed |
154/33 kV ULUDERE TM | MEHMET LATİF ALTUN | Secondary Project | Turkey | Completed |
154/33 kV FETHİYE TM | MAT ENERGY | Secondary Project; Panel Production; Test&Commissioning; Point to Point Tests&RTU Tests | Turkey | Completed |
154/33 kVBİSMİL-2 TM | MAT ENERGY | Secondary Project; Panel Production; Test&Commissioning; SCADA&Automation | Turkey | Completed |
154/33 kV DİKMEN-2 TM | MAT ENERGY | Secondary Project; Panel Production; Test&Commissioning; SCADA&Automation | Turkey | Completed |
ETLİK ENTEGRE SAĞLIK PPP ACS BOX PANO | SIEMENS | Panel Production | Turkey | Completed |
154/33 kV KÖSE TM | ULUTAŞ ENERGY | Motion Analysis Tests | Turkey | Completed |
POWER QUALITY MONITORING PANEL | TEİAŞ 12th DIVISION | Panel Production | Turkey | Completed |
154/11 kV MAV BIOMASS TM | MAV ELECTRIC | SCADA Automation | Turkey | Completed |
KULA BES TEST | GÜNGÖR ELECTRIC | Test&Commissioning | Turkey | Completed |
33/6,3 kV KINIK BES | GÜNGÖR ELECTRIC | Soil Specific Resistance Measurement | Turkey | Completed |
154/33 kV GİRESUN TM | GÜNGÖR ELECTRIC | Panel Production; Test&Commissioning | Turkey | Completed |
154/33 kV KILIÇLAR GIS TM | SHANGHAI SIEYUAN HIGH VOLTAGE SWITCHGEARS CO. LTD. | Secondary Project; Panel Production | Peoples Republic of China | Completed |
154/11 kV MAV BIOMASS TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test&Commissioning; SCADA&Automation; Soil Specific Resistance Measurement | Turkey | Completed |
154/34,5 kV GÖKZİRVE RES TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test&Commissioning; SCADA&Automation; Wind Monitoring Forecast System | Turkey | Completed |
154 kV VAN ARISU TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test&Commissioning; SCADA&Automation | Turkey | Completed |
380/33 kVİSTANBUL RES TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test&Commissioning; SCADA&Automation; Wind Monitoring Forecast System | Turkey | Completed |
154 kV MUTLU RES TM | ORİM ENERGY | Secondary Project; Panel Production | Turkey | Completed |
154 kV LADİK (MERCURY MINE) TM | ORİM ENERGY | Secondary Project | Turkey | Completed |
380/33 kV BARTIN OSB TM | GÜNGÖR ELECTRIC | Isolation, Rating, Polarity and Load Tests | Turkey | Completed |
380 kV LODOS KARABURUN RES | GÜNGÖR ELECTRIC | CT Site Tests | Turkey | Completed |
154 kV EVRENCİK RES TM | GÜNGÖR ELECTRIC | Electricity Production Facilities Projects; Selvaz Measurement | Turkey | Completed |
GÜRSÖĞÜT BRIDGE HES | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
ÇETİN HES CRANE FEED PANELS | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
154/33 kV İÇMELER TM | SİMORA ENGINEERING | Secondary Project; Panel Production; Test&Commissioning | Turkey | Completed |
154 kV KUYULUKOYAK | ORİM ENERGY | Panel Production; Test&Commissioning | Turkey | Completed |
154kV ÇAMINBAŞI RES TM | ORIM ENERGY | Panel Production; Test&Commissioning | Turkey | Completed |
380/33kV ISTANBUL RES TM | GÜNGÖR ELECTRIC | Sıngle Line Diagrams ; CT/VT & Short Circuit Calculations | Turkey | Completed |
154kV VAN ARISU (44MW GES) TM | GÜNGÖR ELECTRIC | Single Line Diagrams; CT/VT & Short Circuit calculations | Turkey | Completed |
154/34,5 kV KILIÇLAR GIS TM | PUNTA YELİ | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV ARAKLI-KAÇKAR HES TM | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
154kV GÜRSÖĞÜT-1 HES TM | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
154kV GÜRSÖĞÜT-2 HES TM | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
AŞAĞIKALE KÖY | GRID SOLUTIONS | Test & Commissioning | Turkey | Completed |
MERCAN HES TM | GRID SOLUTIONS | Test & Commissioning | Turkey | Completed |
154kV SÖKE HES TM | GÜNGÖR ELECTRIC | Primary Equipment Calculations; Electricity Production Facilities Projects | Turkey | Completed |
154kV KINIK BES | GÜNGÖR ELECTRIC | Panel Production | Turkey | Completed |
YÜK TEVZİ | TEİAŞ 8TH. DIVISION | Panel Production | Turkey | Completed |
DÜZCE ÇİMENTO | YS MINING | Panel Production | Turkey | Completed |
154kV AMASYA RES TM | ŞEHZADE ENERGY SAN.TİC. | Switchyard Maintenance | Turkey | Completed |
154kV ESBAŞ GIS TM | SHANGHAI SIEYUAN HIGH VOLTAGE SWITCHGEAR CO.LTD | Secondary Project; Panel Production | Turkey | Completed |
154kV YENİKÖY RES TM | ORİM ENERGY | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation; Secondary Assembly | Turkey | Completed |
154kV KORU RES TM | ORİM ENERGY | Secondary Project; Panel Production; Test & Commissioning; Secondary Assembly | Turkey | Completed |
154kV ÇETİN HES | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
SOUTH KARBOLA | IF GROUP | Buat Production | Turkey | Completed |
ZAYONA | IF GROUP | Buat Production | Turkey | Completed |
NORTH KARBOLA | IF GROUP | Buat Production | Turkey | Completed |
NORTH KARBOLA | IF GROUP | Buat Production | Turkey | Completed |
MUSUL | IF GROUP | Buat Production | Turkey | Completed |
SFC KASTAMONU | KRONOSPAN ORMAN ÜRÜNLERİ SAN.TİC. | Thermal Camera Measurements And Reports | Turkey | Completed |
ÇETİN HES | ANDRITZ HYDRO | Thermostat Controlled Feed | Turkey | Completed |
281 380/154/33kV YENİKÖY TES TM | DATEL TELLİOĞLU | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
291 154/ 33kV MUĞLA GÜNEY TM | AVRASYA ENERGY | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
258 154kV BEŞYÜZEVLER GIS TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
DÜZCE ÇİMENTO FABRİKASI | YD MINING | Panel Production | Turkey | Completed |
ÇETİN HES INTAKE & SPRILLWAY AC DIST | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
235 154/33kV GİRESUN TM | GÜNGÖR ELECTRIC | Panel Production | Turkey | Completed |
PJSC Nizhnekamskneftekhim CCGT-TPP | SIEMENS | Panel Production | Turkey | Completed |
154kV EVRENCİK RES TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation; Soil Specific Resistance Measurement; Wind Monitoring Forecast System | Turkey | Completed |
BİLKENT ŞEHİR HASTANESİ | SIEMENS | Panel Production | Turkey | Completed |
BİLKENT ŞEHİR HASTANESİ | SIEMENS | Panel Production | Turkey | Completed |
154kV OSMANCA TM (TEVSİAT) | YD MINING | Secondary Project; Panel Production; Test & Commissioning; Secondary Assembly | Turkey | Completed |
154/6,3kV YIĞILCA TM | YD MINING | Secondary Project; Panel Production; Test & Commissioning; Automation; Power Quality Measurement System | Turkey | Completed |
265 154/33kV KIZILIRMAK TM (TEVSİAT) | GÜNGÖR ELECTRIC | KATO Panel Production | Turkey | Completed |
380kV BARTIN OSB TM (TEVSİAT) | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV SÖKE RES TM | GÜNGÖR ELECTRIC | Panel Production; Test & Commissioning; Scada & Automation;Soil Specific Rsistance Measurement; Wind Monitoring Forecast System | Turkey | Completed |
154/34,5kV ALİAĞA TM (TEVSİAT) | GÜNGÖR ELECTRIC | Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
ÇETİN HES VİNÇ PANOLARI | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
154kV HYUNDAI ASSAN TM | HYUNDAI ASSAN | Secondary Project | Turkey | Completed |
380kV KAVACIK GIS TM | GRID SOLUTIONS | Panel Production | Turkey | Completed |
ALİAĞA GIS TM | GÜNGÖR ELECTRIC | Panel Production | Turkey | Completed |
154kV ÇİÇEKLİ HES | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
380/154kV (TEVSİAT) | METİS ENERGY | Panel Production; Test & Commissioning | Turkey | Completed |
154kV YIĞILCA TM | OEN ENERGY | Secondary Project; Panel Production | Turkey | Completed |
154kV ALAŞEHİR HAVZA TM (TEVSİAT) | TELLİOĞLI GROUP | Panel Production; Test & Commissioning | Turkey | Comleted |
154kV BEYLİKDÜZÜ TM (TEVSİAT) | GENSER ENGINEERING | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
BAHRİBABA GIS | TFS ELECTRIC | Panel Production | Turkey | Completed |
400kV NASSIRIYA (TEVSİAT) | AL-MIAL FOR TRADING CONSTRUCTION | Secondary Project; Panel Production | Turkey | Completed |
154kV AKORSAN TM (TEVSİAT) | AKGÜN ELECTRIC | Secondary Project; Panel Production | Turkey | Completed |
154kV ÇAĞLAYAN HES TM | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
154kV KEMER HES TM (TEVSİAT) | BEREKET ENERGY | Secondary Project; Panel Production | Turkey | Completed |
BAHRİBABA GIS TM | GRID SOLUTIONS | Panel Production | Turkey | Completed |
ÇETİN HES TM | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
ÇİÇEKLİ HES TM | ANDRITZ HYDRO | Panel Production | Turkey | Completed |
KARAKURT HES TM | GRID SOLUTIONS | Panel Production | Turkey | Completed |
154kV AMBARLI SULTAN MURAT TM | SİMORA | Panel Production | Turkey | Completed |
154kV META TM | GRM ENERGY | Panel Production; Test & Commissioning; Secondary Assembly | Turkey | Completed |
DASHBASHI HEPP - LV And Control Panels | ANDRITZ | Panel Production | Turkey | Completed |
154kV KKEP TCDD KARAMAN TM | SIEMENS | Secondary Project; Panel Production; Test & Commissioning; Secondary Assembly | Turkey | Completed |
154kV KKEP TCDD ÇUMRA TM | SIEMENS | Secondary Project; Panel Production; Test & Commissioning; Secondary Assembly | Turkey | Completed |
154kV BURHANİYE TM | ORİM ENERGY | Panel Production; Test & Commissioning | Turkey | Completed |
AVANI HEPP | ANDRITZ | Panel Production | Turkey | Completed |
MANA GAI HEPP | ANDRITZ | Panel Production | Turkey | Completed |
KHADORI LOW VOLTAGE | ANDRITZ | Panel Production | Turkey | Completed |
154kV GİRESUN TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV DİNÇER ÇİMENTO TM | ELTA MAKİNA | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation; Secondary Assembly; Communıcatıon Systems | Turkey | Completed |
154kV KAYSERİ BÖLGE PANOLARI | KOZTEK | Panel Production | Turkey | Completed |
154kV ELEŞKİRT TM | NEXT ENERGY | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation;Secondary Assembly | Turkey | Completed |
ÇEKEREK HES | ANDRITZ | Panel Production | Turkey | Completed |
154kV ÇANAKKALE HAVZA-1 TM | AKGÜN ENGINEERING | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV AKSU TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV ASYAPORT TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV KIZILIRMAK TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV ASİLÇELİK TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
ALMUS HES | ANDRITZ | Panel Production | Turkey | Completed |
ABB TRANSFORMER PANEL | ENERTAŞ | Panel Production | Turkey | Completed |
154kV HİLAL TM | GRM ENERGY | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
154kV KARABÜK TM | NEXT ENERGY | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
154kV MANİSA OSB TM | ONMUŞ ELECTRIC | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
BTK KARTLI GEÇİŞ SAHA PAN. | SIEMENS | Secondary Project | Turkey | Completed |
154kV BATMAN-2 TM | ERİŞİM ENERGINEERING | Test & Commissioning | Turkey | Completed |
154kV HYUNDAI ASSAN TM | ERSAN COMPANY | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
380kV ERMENEK TM | ZAFER COSTRUCTION | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV YENİHİSAR RES | EM ELECTROMECHANICAL | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
154kV TAVAS TM | HK ENERGY | Panel Production | Turkey | Completed |
154kV GÖLPAZARI TM | SELÇUK ALBAYRAK | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
ALİAĞA GIS | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
ÇAMINBAŞI RES | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
KARABURUN | LODOS | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
SİVAS YERKÖY | SIEMENS | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
MASPO ALA-2 JES | TELLİOĞLU | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
MANİSA OSB-2 | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
UZUNDERE | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV SFC KASTAMONU TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation; Ss Maintenance | Turkey | Completed |
154kV KELKİT AHLAT/ ALF ELECTRIC | SIEMENS | TEİAŞ Rellay Training | Turkey | Completed |
132kV KIBTEK 09 HASPOLAT | SIEMENS | Panel Production; RTU Systems | Turkey | Completed |
14kV KUZOVA POMPA İSTASYOMU TM | YAPIEL | Secondary Project; Panel Production | Turkey | Completed |
154kV KUZOVA POMPA İSTASYOMU TM | YAPIEL | Panel Production | Turkey | Completed |
154kV İNEGÖL TM-SAYAÇ PAN. | PLANTEST | Panel Production | Turkey | Completed |
154kV DÜZOVA RES TM | RAVEN ENERGY G17 | Panel Production | Turkey | Completed |
154kV KAYNARCA TM | KM ELECTRIC | Panel Production | Turkey | Completed |
ŞAVŞAT HES YÜKLEME HAVUZU PAN. | ANDRITZ | Panel Production | Turkey | Completed |
400kV ÇAN II TM | KRATİS | Panel Production; Test & Commissioning | Turkey | Completed |
154kV LAPSEKİ TM | ORİM ENERGY | Panel Production; Test & Commissioning | Turkey | Completed |
154kV KAROVA RES TM | FİNA ENERGY | Panel Production; Test & Commissioning | Turkey | Completed |
SEYYAR PANOLAR-2017 | ROKETSAN | Panel Production | Turkey | Completed |
154kV BURÇAK-1 TM | SUATA | Rtu Tests | Turkey | Completed |
154kV BURÇAK-2 TM | SUATA | Rtu Tests | Turkey | Comleted |
154kV ÇERKEZKÖY OSB | SIEMENS | Panel Production; Test & Commissioning | Turkey | Completed |
KAVAK HES TM | ANDRITZ | Panel Production; Functional Test | Turkey | Completed |
154kV GÖKDAĞ RES | KM ELECTRIC | Panel Production | Turkey | Completed |
DERALOG-AYDINLATMA PAN. | IF GROUP | Panel Production | Turkey | Completed |
154kV YEŞİLHİSAR TM | SEKMAN ENERGY | Panel Production; Test & Commissioning; Secondary Assembly | Turkey | Completed |
154kV SOMA ÇİMENTO TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation; Secondary Assembly | Turkey | Completed |
154kV YEŞİLHİSAR TM | SEKMAN ENERGY | Panel Production; Test & Commissioning; Secondary Assembly | Turkey | Completed |
154kV SOMA ÇİMENTO TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation; Secondary Assembly | Turkey | Completed |
BİLKENT HASTANESİ | SIEMENS | Panel Production | Turkey | Completed |
BİLKENT HASTANESİ | SIEMENS | Panel Production | Turkey | Completed |
BİLKENT HASTANESİ | SIEMENS | Panel Production | Turkey | Completed |
154kV KORU RES TM | ORİM ENERGY | Panel Production | Turkey | Completed |
154kV PERENCO TM | GÜNGÖR ELECTRIC | Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV YEŞİLYURT TM | GÜNGÖR ELECTRIC | Primary & Secondary Tests | Turkey | Completed |
380kV ATAŞEHİR GIS | AKTİFSEL ENERGY | Test & Commissioning | Turkey | Completed |
154kV DİYARBAKIR-3 TM | GÜNGÖR ELECTRIC | Panel Production; Test & Commissioning | Turkey | Completed |
154kV AKDAĞ RES | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV CEYHAN 1 TM- Tevsiat | BB ENERGY | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
154kV CEYHAN 2 TM- Tevsiat | BB ENERGY | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
154kV ŞARKIŞLA TM - Tevsiat | BB ENERGY | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
154kV SORGUN TM - Tevsiat | BB ENERGY | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
154kV KOZAN TM - Tevsiat | BB ENERGY | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
DEREKÖY HES - Yükleme Havuzu PAN. | ANDRITZ | Panel ProductioN | Turkey | Completed |
KOÇ ÜNİVERSİTESİ - EK BİNA DDC PAN. | SIEMENS | Panel Production | Turkey | Completed |
TÜRKMENİSTAN GAP - DDC.PAN. | SIEMENS | Panel Production | Turkey | Completed |
154kV AKINCI HES TM | BEREKET ELECTRIC | Secondary Project; Panel Production; Test & Commissioning | Turkey | Completed |
154kV OSMANİYE TM | ZAFER BUILD | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation; Secondary Assembly | Turkey | Completed |
ETİBAKIR MAZI DAĞI Kuyu PAN. | SIEMENS | Panel Production | Turkey | Completed |
154kV ALADAĞ TM HES | ZAFER BUILD | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
3.KÖPRÜ | SIEMENS | Panel Production | Turkey | Completed |
3.KÖPRÜ PRC ET PAN. | SIEMENS | Panel Production | Turkey | Completed |
VİYADÜK GEÇİŞ KÖPRÜSÜ | SIEMENS | Panel Production | Turkey | Completed |
154kV DARICA-2 HES | ORİM ENERGY | Panel Production; Test & Commissioning | Turkey | Completed |
YSS PLC_ SWITCH | SIEMENS | Panel Production; Test & Commissioning | Turkey | Completed |
154kV ÇAMOLUK TM | SİS.EBRAR | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation;Point-to-point & Rtu Tests | Turkey | Completed |
154kV ÇAYIRHAN TM | ANDRITZ | Panel Production; Secondary Assembly | Turkey | Completed |
154kV DARICA-1 | BİLGİN ENERGY | Panel Production; Secondary Assembly | Turkey | Comleted |
BİLKENT SAĞLIK BAKANLIĞI BİNASI | SIEMENS | Panel Production | Turkey | Completed |
154kV DİNAR RES TM | SIEMENS | Panel Production | Turkey | Completed |
220kV SUGD SSS TACİKİSTAN | GENSER | Secondary Project; Panel Production | Turkey | Completed |
154kV BERGRES TM | GÜNGÖR ELECTRIC | Secondary Project; Panel Production; Test & Commissionin | Turkey | Completed |
154kV ALİAĞA TM | SELÇUK ALBAYRAK | Panel Production | Turkey | Completed |
154kV KONYA OSB | ZAFER BUILD | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Comleted |
154kV BUCA TM RTU | İNEMKO ELECTRIK | Secondary Project; Panel Production; Test & Commissioning; Scada & Automation | Turkey | Completed |
154kV İSTANBUL YENİ HAVAALANI GIS | KRATİS | Panel Production | Turkey | Completed |
154kV MANAVGAT HES | ANDRITZ | Panel Production | Turkey | Completed |
154kV KEMALİYE JES TM | SIEMENS | Panel Production | Turkey | Completed |
154kV KARGI HES TM | SIEMENS | Secondary Project | Turkey | Completed |
154kV ÇAMBAŞI RES TM | SIEMENS | Panel Production | Turkey | Completed |
154kV ARDANUÇ TM | GÜNGÖR | Panel Production | Turkey | Completed |
154kV POYRAZ RES | SIEMENS | Panel Production | Turkey | Completed |
İTM.287 154kV BOSTANCI GIS TM LCC | SHANGHAİ SIEYUAN HIGH VOLTAGE SWITCHGEAR CO.LTD | Secondary Project; Panel Production | Turkey | Ongoing |
JIJI HEPP | ANDRITZ HYDRO | Panel Production | Turkey | Ongoing |
MULEMBWE HEPP | ANDRITZ HYDRO | Panel Production | Turkey | Ongoing |
ŞEHİTKAMİL OSB TM (TEVSİAT) GAP | MEHMET LATİF ALTUN | Secondary Project; Panel Production; Test & Commissioning | Turkey | Ongoing |
İTM.390 154kV BESNİ OSB TM | MEHMET LATİF ALTUN | Secondary Project; Panel Production; Test & Commissioning; SCADA & Automation; Secondary Assembly | ||
400kV KARADENİZ DOĞALGAZ GIS TM | GÜNGÖR ELEKTRİK | Secondary Project; Panel Production; Test & Commissioning; SCADA & Automation; Secondary Assembly | Turkey | Ongoing |
154kV BAĞLICA GIS LCC | SHANGHAİ SIEYUAN HIGH VOLTAGE SWITCHGEAR CO.LTD | Secondary Project; Panel Production | Turkey | Ongoing |
İTM.364 154_33kV OZALP TM | ARMİN ELEKTRİK İNŞAAT SAN. VE TİC. A.Ş | Secondary Project; Panel Production; Test & Commissioning; SCADA & Automation; Secondary Assembly | Turkey | Ongoing |
İTM.356 420-170kV ATATÜRK TM (TEVSİAT) | ARMİN ELEKTRİK İNŞAAT SAN. VE TİC. A.Ş | Secondary Project; Panel Production; Test & Commissioning; SCADA & Automation | Turkey | Ongoing |